PRT

Hi all,

I would like to know, how to get PRT usage for a particular month. I have tried coois, but there is a confusion in selecting the dates. (Basic dates, schedule dates,actual dates etc..).

Pl. advise.

KNM

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 09, 2010 at 04:40 AM

    Hi,

    1. For PRT Usage have u assigned any formulae ?

    2. Becuase if you need to get the PRT usage then there are some pre-requisites / Steps that you should have done.

    3. May the link should be useful[::PRT -USAGE|http://sap-pphelp.blogspot.com/2009/12/calculating-usage-for-prt.html]

    let me know your feedback.

    Reg

    Dsk

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.