Issue with batch numbering for partial lot at MIGO(101) in PP

Hey guys, greetings. I am creating partial lots and batches during in process inspection against single process order. When I am doing MIGO(GR-101) for the same process order we want that system should propose all the batch number (created in reference to partial lots). But system is not doing so, it is giving me single automatic batch during posting. At present I am doing MIGO for each partial lot and batch separately. Please help me out on this. Thank you!!!

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Dec 02, 2016 at 09:44 AM

    You can propose an existing batch by user exit and setting flag allow_existing_batch.
    There are several notes available which explain this, search with allow_existing_batch in LO-BM notes you should find the relevant notes

    BR,
    Sabine