on 07-07-2010 1:45 PM
We have a requirement for component rqmt date to always fall on Thursday even if it occurs on a non-workday per the factory calendar. Lot sizing settings include: lot sizing procedure = P, Lot-size indicator = K, Event interpretation = 1. Planning calendar settings include: if period start is not a workday, do not displace and periods begin on Thursdays (weekly calculation rule).
When the planning run occurs, period start is still displaced to next workday when period start occurs on a non-workday. Also requirements due date moves to next production day instead of falling on Thursday. I tried manually changing the period to start on the desired date and re-running MRP but the rqmt date was not updated. What settings should be changed to allow this scenario?
Planning calendar needed to be unfirmed then recalculated. As far as rqmts, per SAP the rqmts will not fall on non-production days by design- cannot change this.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.