Skip to Content
0
Former Member
Jul 06, 2010 at 05:34 AM

Charm connectivity and transport

15 Views

I have a Solution manager 7.01 Ehp1 I wanted to connect the ECC system with Solution manager to move the transports between Dev -- QA -- PRD after Approval.

Can anybody update on how is this connectivity done and if we do this connectivity then can we still moved the transport in a usual manner fron Dev- QA - Prd.

Thanks