Hi Guru,

Currently I use 4 meta-chains to run 4 times the same transactional data process chain.

The 4 meta-chains use 4 different Start Process scheduled at 5:00AM, 12:00AM, 7:00PM and 11:00PM.

In a near futur, I would like to maintain only one process chain for all of these start times.

1- does a free scheduler exist for SAP BW?

2- does everyone use a method based on a specific abap program which control the start time due to a specific table to trigger an EVENT? (i.e. a specific scheduler)

3- does anyone use a different and good method?

I don't want a solution based on the creation of the same number of jobs [SM37] as the same number of Start Process.

Thanks in advance for yours feedbacks.