We are facing some strange issue in SAP:

PO was created for particular line item and accordingly GRN was done. Now when users are trying to reverse the GRN then system is not allowing and message is displayed " No suitabel line item found".

Then we checked the PO and found that in item detail - Confirmation tab -shipping notification has been activated. Now my concern is that how shipping notification is activated once GRN is done because when i am trying to simulate the scenario it is in the display mode. When PO was created at that time no confirmation control was assigned due to which GRN was done w.r.t PO.

We have also checked that after PO and GRN done in vendor master confirmation control key has been assigned. But this should not be affected in the current PO as GRN has already been done, then there is no point that confirmation control key should be assigned to PO. But as we see the confirmation control key in PO after GRN was done due to which system is not allowing us to reverse the GRN.

Please advise if some one has faced this issue earlier.