Skip to Content
0
Former Member
Jun 30, 2010 at 11:51 AM

Problems in having common material and batch in different plants

14 Views

Hi all,

As the material with the same batch is existing in different plants, we are facing some problems in processing the Process Messages.

If some user who belongs to a different plant is processing the batch for the material, the Process messages are not being sent the destination as we get an error message that the reservation is currently processed by user (who actually belongs to a different plant). This is effecting the Business.

Can anyone tell me how we can prevent this? Could the reservation and Batch status set as plant level control via standard IMG change ?

Regards,

Brijesh