Creation of campaign

Former Member
0 Kudos

Dear Friends,

I am trying to create one scenario for campaign planning. I have two products A and B which is being produced on Resource R.

Configuration I have done

1. Campaign profile

2. Strategy profile

3. Optimizer profile with campaign and bottleneck optimization active

Master Data.

Defined respective setup groups in PPM

set up matrix

Defined resource as campaign relevant and assigned setup matrix into it.

Now I have demand of these products. I am running heuristic and creating planned order.

After that I am running heuristic SAP_PCM_CRTwith strategy profile in order to create campaigns

But campaigns are not getting created. I have no clue why it is happening.

or

I run optimizer but still result is same

Please correct me if I m missing something.

Regards,

Pankaj Modi

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Pankaj,

Have you created one dummy product and PPM with same resource for this product.

Have assigned this PPM in set up matrix for different set up transistions.

Regards,

Santosh

Former Member
0 Kudos

Yes, I have done that.