How to manage work center in Production order

Hi,

I am producing a material having one operation (suppose cutting), which I have mentioned in the routing. I have also mentioned the work center in routing on which cutting operation will be performed. When I make the Production order of 1000 pcs there comes only one work center. But practically, they are producing these 1000 pcs on two different work centers ( 500 on one and 500 on second). How to manage this in SAP.

Kindly help me.

Thanks and Regards,

Yogesh Singla

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Jun 28, 2010 at 05:55 AM

    Dear Yogesh,

    You need to go with splitting option in Routing

    Kindly go through this thread

    [how to map this scenario in sap pp;

    Regards

    Madhu

    Add comment
    10|10000 characters needed characters exceeded

  • Jun 28, 2010 at 06:20 AM

    Dear ,

    What is the individual capacacity of the Work Centre -CR02-Header -No of Individual Capacity ?

    I think you must be using similar kind of work centre of 2 no 1000 pc .Now , when you are creating routing for this , you should hit Required Spilliting in Routing Operation -Select Operation line item and then Double click -Select Spilitting and enter splitting No 2.

    At the same time in CR02-Work Center -Capacity Tab -Hit the Header -In the Bottom of the Detail Capacity Header -Avaialabile Capacity -Include 2 as Number of Inidvidaul Capacity and SAVE.

    Now based on thr required spilittinga and invidual caapcity , it will consider the Work Centre Load .

    Other wise , you can enter one more operation line in routing with similar Labor hrs , work center and control key in routung for production of 1000 pc .

    Hope it clarifies

    Regards

    JH

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Dear,

      Thanks for your reply.

      I have done all these settings, but where to mention second work center because operation performed is same but work center codes are different. While doing confirmation only one work center ( mentioned in routing is picked). how second work center will come while doing confirmation.

      Thanks and Regards,

      Yogesh Singla