SPC chart

37 Views

Hi Friends,

i have a issue in SPC

I have taken sampling procedure-fixed sample.

valuation mode- SPC inspection

with free inpection point-tick

control chart type-216 shewhart chart for x-bar/samples/USA

Sample seize-5

inspection frequency-1

in MIC maintained all these-

lower limit,uper limit,target value,sampling procedure,spc characterictic,single result,fixed scope.

in QP01 -I am taking in SPC creation-60 master inspection charastestic.

after doing result recording,clicking control chart-getting graph parallel line.i tried lot. but always graph is coming paralell.i cudnt understand the result.

pls help me do to suitable setting so that i can see the graph result.

regards,