cancel
Showing results for 
Search instead for 
Did you mean: 

Configuration in SWEQADM

Former Member
0 Kudos

Hi,

We are facing a serious problem in Prod for all the workflows(coutomize and standard).Its often getting inactive(event linkages in SWDD).Everytime we need to login to prod and activate it.It will work for some days and automatically gets inactive.So i heard that there are some settings in SWEQADM which needs to be configured.So please let me know what all the parameters and configuration that needs to be configured in SWEQADM in detail.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

thank u all..Thread closed.

former_member249671
Participant
0 Kudos

In Production pls check the workflow ..Just click on check button it shows any errors.

In swe2 select the option : dont change the linkage when there is errors.

as far as i know sweqadm is for Event Queue Administration. ru using event queue for delivering events in Production

Former Member
0 Kudos

Hi,

In swe2 iam able to see a lot of WF's are not present.Do i need to retransport it again from dev to prod??.

former_member249671
Participant
0 Kudos

Pls Check in Production. If itsis not there Transport it

Former Member
0 Kudos

But most of the people are telling that the problem might be due to SWEQADM itseems!!

former_member249671
Participant
0 Kudos

If ur delivering events using Event Queue u can check that .

Pls make sure how events getting delivered. Other wise SWE2 is correct one

Former Member
0 Kudos

Hi Sunil,

Could you please elaborate me in detail.As iam getting a lot confuse in this issue and need to be complete ASAP

former_member249671
Participant
0 Kudos

Hi,

1) U must be aware events will be delivered By TRFC .

2) Once event is getting delivered it starts the workflow automatically

Event Queue : If U activate event Queue once event is triggered. It will go to the event Queue ( Workflow Wont Start Immediately). In event Queue adm (SWEQADM) u will schedule a background job perodically which delivers the event at that time subsequently workflow for that event starts

3) SWEQADM - Event queue Administration.

In Swe2 U can see event Queue check box . if u activate that checkbox and configure in SWEQADM events will go the QUEUE and delivered once the program runs.

In Your case resilution is simple.

1) make sure u r using event queue or not if it is change the behavoiur up on error feedback to Dont change linkage

2) In SWE2 also change behavoiur up on error feedback to Dont change linkage

Pls revert back incase of queries

rina_spector3
Explorer
0 Kudos

Hello,

Check in SWEQADM the basic data tab , value of Receiver upon feeadback is Marked " 3- do not change linkage ".

\you need also check that the event is marked as you may set the same on the specific event , check trn, SWETYPV

the value of Behavior upon error feedback

And try to monitor what errors cause the deactivation on the first place. ..

Best regards

Rina spector,