Skip to Content
0
Former Member
Jun 22, 2010 at 10:58 AM

Factory overhead confirmation

45 Views

Hi All

How do you confirm factory overhead if material has co-product?

Scenario:

material x (as main product) = 30,000 qty

material y (as co product) = 69,000 qty

What will be the entry in factory overhead field in CO11N? Is it the total qty which is 99,300? Or total qty divided by 2? Or we'll get the assigned apportionment/ratio for this?

Thank you

Jesielle