Skip to Content
0

Constraints in IBP S&OP Optimizer

Dec 01, 2016 at 01:11 PM

150

avatar image
Former Member

Hello Team, Greetings of the Day :)

We are working on a scenario for an utility industry and modeling their supply chain in IBP.

We are facing tough times in introducing the below 2 constraints in to the Optimizer engine...

Raw Material Constraint: Government draws a control line on how much we can consume from a source of supply(irrespective of its availability), and that control line varies dynamically from period to period and goverment decides it. Based on that control line value, Optimizer engine should consume that source of supply or if its not sufficient, it should naturally opt for other sources of supply.

Capacity Constraint: Capacity varies dynamically in the production facility. Accordingly the optimizer should consider the production facility, if its not sufficient it should opt for another production facility to meet the demand.

Please help me on how can i configure these constraints in my optimizer profile ?

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers