06-21-2010 1:19 PM
Hello,
We have a problem in the integration system. This is because of the non synch of system.
So we came across with a solution.
1. We have u201CTP Copies TRu201D. We need to automate that all the TRs that are moving (releasing) from Proto to integration system is getting stored in the u201CTP Copies TR u201C
2. By doing the above, all the changes which has been done after the last integration system refresh period will be Stored in the u201CTP copies TRu201D.
3. Now after the current Refresh, when we move this u201CTP Copies TRu201D, all the Existing Problems will be solved
Kindly advice.
Best Regards,
Vijay
06-21-2010 1:41 PM
How is your integration system being refreshed? From production system I assume?
If yes, you need to re-import all transport requests into integration that had not been imported into production yet. Your system admin should be able to come up with that list via the STMS tools. You can also create a new transport in prototyping/DEV via SE03 tools containing all objects of the above mentioned transport requests, but then you must be careful because you are transporting the current state in prototyping, which might well be "non-finalised".
No need for a "transport of copies" in my opinion.
Thomas