VL06I - GR - Not tied to LT06 - TO creation for Material Document

Former Member
0 Kudos

Hi,

When I do GR from VL06I report for Inbound deliveries, it does not take me to LT06 - TO creation with respect to Material Document after GR posted.

Basically it takes to VL32N screen during GR posting.

Manually when I do GR using Tcode VL32N - takes me to LT06 for TO creation, after GR posted.

Any config needs to be done?

Please advice.

Thanks in advance.

Rajesh

Accepted Solutions (0)

Answers (1)

Answers (1)

harry_wu
Contributor
0 Kudos

In standard, if you use inbound delivery, the TO put away should happen before GR.

Did you make any modification to standard system? In vl32n, when posting GR, what's the putaway status of the delivery?

In VL06iG, system calls function module WS_DELIVERY_UPDATE_2 to post GR. The logic is a little different from VL32n.

Former Member
0 Kudos

Hi,

Thanks for the reply.

I am using - VL06I report, secondly Delivery Status Overall Putaway Status - Not for Putaway, OverallWM Status - No WM trns Ord reqd for the Inbound Delivery created (PGR not done).

Thanks,

Rajesh

harry_wu
Contributor
0 Kudos

Did you make any modification in VL32n?

As far as I know, in standard, system won't goto lt06 automatically after posting GR in vL32n.

Former Member
0 Kudos

Hi,

OK, Thanks for the reply.

Rajesh