Engineering Change Management Alternative date assignment to Material BOM

Prasath
Contributor
0 Kudos

Dear experts,

I have scenario of M-BOM change/Delete thru ECN. Single ECN can be used for multiple material and multiple Plant (Since it same model and ECN is client level).

Ex:

ECN is created on 16.10.2018 and same number is used multiple plant 1000,1010 and 1030.

Same number used on date 21.12.2018, 24.01.2019,25. 01.2019,28, 02.2019 and 29.01.2019 and assigned respectively.

But on 29.01.2019 we have changed M-BOM thru same ECN with alternative date.During assignment there is not option to choose the specific material M-BOM .SO that we have selected all material BOM and assignment is done.

Plant: 1000

Material BOM : 8007691P91

Rest of the BOM are changed before 29.01.2019 due to inconsistent of specific BOM selection we have selected all and assignment is done

Is there any option to choose the Specific material BOM during alternative date assignment.

Appreciate your answer and thanks in advance

Regards,

Prasath E

Accepted Solutions (0)

Answers (0)