Sapguru,
for my client where they have send 100 nos of A material to subcontacting vendor for making 100 nos of B and along with that i have send the subcontactinng challan for 100 nos. but due to excise law, vendor side, he send back the 50 nos of A within 180 days to the plant in order to protect them any penalty from excise dept.
The process followed
ME21N(45000001)
MB1B(541) for 100 nos of A to subcontracting vendor(49000001)
J1IF01(40001) for 100 nos of A
MIGO( 101) for 50 nos of B with 50 nos(543) consumed
That means the remaining quantity(50 nos of A) is lying at the vendor side.
J1IFQ for 50 nos of A.
then i have done 542 movement type for bringing the material back from the subcontracting vendor due to tcorssing of the time lenght (180days).
then once again i will send the goods to same vendor for remaining 50 nos of A (MB1B-541Mvt type)
J1IF01 I will create the another challan(40002) for 50 nos of A.
My question:-
is it possible in SAP where i could see the reduction of 50 nos wrt to challan no(40001) in report. that means if i open any report then i could see that for 40001 challan, the total quantity should be 50 nos.
Thanks praveer