I have one finished product, including semi-finished product which included raw material. semifinished product has four alternative BOMs

when we run CK11N for finished product, system pick up BOM 1 for semi-finished product. but we want to cost based on alter.BOM 2, we don't want to delete BOM1, so can we block BOM1,how to do it? or can we set BOM1 not relvant to costing, I try CS02, but no such functionality, can this be done or do we need other configuration? Thanks

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 18, 2010 at 08:56 AM

    Hi hennylin,

    There is no need to do that, you just go to costing data 1 in material master of that semifinished product and enter production version 2, by doing this whenever this material is selected for costing, system will use prod. version 2 for same.

    Regards,

    Sayujya

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.