on 06-17-2010 11:29 AM
Hi All,
I am dealing with a variant configuration scenario. The line time in the sales order gets exploded to two sub-items. One of which is a returns item.
The line item gets exploded as it should the first time. The problem is when ever I select the main line item and go to its configuration, the BOM kind of gets re exploded and only the return line item gets added. Every time I go to the configuration the return item gets added to the sales document in multiples of 2(i.e. 1, 2, 4, 8....).
Am I missing something here. Where exactly am I messing around. Any help would be highly appreciated.
Regards,
Chaitanya
Chaitanya
For the item which is getting repeated, check if there is a BOM with the same material as component. Also check if recursiveness is allowed in this or the header item BOMs.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Chandrasekhar for you replies.
Guess there is one important thing that i need to specify here. Once the BOM explodes, the plants of the sub itmes are being changed to meet the accounting requirement. What I have found is when the plants of the sub items are same, then the re-explosion of the BOM doesn't take place. I guess replacment of the plants of the sub times to be different is causing the error although, don't exactly know how that is causing an issue.
Any thoughts on this are most welcome.
cheers!!
Chaitanya
Check you I Cat (VOV7)
in its Structure scope under BOM section, based on your requirment.
either it should be C: Configuration, no BOM explosion or 😧 Configuration, poss. with BOM explosion
Thanks & Regards
JP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.