Hi, Please let me know if the following scenario is a possibility.

We currently maintain our capacity utilization at 90% for any resource and the same number is carried over to APO (SCM 5.0) with CIF. The requrement we have is to set this utilization to 100% for the rolling current date+3 months and 90% outside the 3 month horizon. I know that the dates can be specified explicity in R/3 but I don't know if the rolling 3 month is possible. Please let me know if this can be achieved via config or master data setting in APO.