Skip to Content

WM-PP : Backflush a material from different bins in the same storage Type

Hi Gurus,

We have a business scenarion where we do manual staging for production , the staging area has different bins within the same storage type for the same material, I am wondering if there is a way to backflush the material from different storage bins upon prod. order confirmation (using a control cycle?)

Thanks

Kris T

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Aug 14, 2011 at 08:56 PM

    Not Answered..

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 29, 2011 at 02:14 PM

    Look like it's not possible using the SAP standard.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.