Routing operation split

Former Member
0 Kudos

hi all,

I have defined 2 splits in the work center. Operation split is ticked in routing.

When I create an order for 10 units , it is getting split as 7.5 and 2.5. i would like to know where this proportion is defined if it can be ?

Regards,

Yogesh

Accepted Solutions (1)

Accepted Solutions (1)

former_member196398
Active Contributor
0 Kudos

Yogesh,

In the operation details you need to activate the Required Splitting indicator and maintain the minimum time for splitting, based on this system calculates the number of splits by dividing the processing time for the operation by the minimum processing time.

Regards,

Prasobh

Answers (1)

Answers (1)

former_member196530
Active Contributor
0 Kudos

Dear ,

It is based on the Formula Key(SAP001,SAP002,SAP003-OPK3/OP7B ) maintained in Work Centre -Capacity Tab and routing operation -Splitting Allocation in operation -co02-production order -operation overview-select the operation -Capacity Req.assingment -Split qty .

Regards

JH