on 01-24-2019 5:19 PM
Has anyone used service entry sheet cost accumulated against WBS via resource related billing (DIP)
Within DIP configuration system allows you to pick characteristic called "Activity Number" and have sources and materials determined for billing, but I keep on getting that there is no value to pick. I know for fact my sources selection criteria and Material determination criteria is correct.
If I pick any other cost DIP configuration does pick those values, not that were posted through service entry sheets.
Can someone share an example where they have used service entry sheet as characteristic within DIP for billing hours.
In RRB the Activity Number is a characteristic that comes from the Service PO Service Master. Do you have Service Masters specified on the Service tab of the Service PO? Service Masters are analgous to Material Masters.
If you follow the SAP Best Practice for external people charging time through CATS and a PO / Service Entry Sheet you can use the Activity Type as a characteristic.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.