cancel
Showing results for 
Search instead for 
Did you mean: 

Communicatiion Channel

Former Member
0 Kudos

Hi

Can " Availability Time Planning " be used to schedule polling at two different times. I mean I want it to poll two times a week, on two different days. On monday and friday. So can a single communication channel be configured to poll twice in a single week or do we need two CC to do this.

Ajith

Accepted Solutions (1)

Accepted Solutions (1)

former_member200962
Active Contributor
0 Kudos

Configure the ATP as Weekly and then select the required days of the week (Monday and Friday)....no need of two channels.

Regards,

Abhishek.

Former Member
0 Kudos

Thanks Abhishek

These two interfaces are eating my head. So this is resolved !

Answers (0)