Skip to Content
0
Former Member
Jun 04, 2010 at 11:21 AM

Period to Analyze in MC.9

48 Views

I have earlier seen that in the Tab "Period to Analyze" in MC.9 the option is of date. in the current set up the same is Period. How to change the option from "Period" to "Date"