cancel
Showing results for 
Search instead for 
Did you mean: 

Period to Analyze in MC.9

Former Member
0 Kudos

I have earlier seen that in the Tab "Period to Analyze" in MC.9 the option is of date. in the current set up the same is Period. How to change the option from "Period" to "Date"

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member197616
Active Contributor
0 Kudos

Hi,

In the MC.9 the date field can not be given.That field is to provide the period.

Regards,