Former Member
Jun 03, 2010 at 03:29 PM

LTP consider production version and not consider selection id for routing

133 Views

Dear guru.

I run mrp long term planning for a material.

The material have a production version linked to a specific bom and routing.

In trx OPU5 I have defined that the planning scenario consider a specific selection id for routing , this routing is different from the routing of production version.

The result is that for this material ltp donu2019t consider any routing and no evaluation activity is possible.

Do you know a solution in order that for LTP the system donu2019t consider production version and instead only consider OPU5 settings ?

Thanks for your interesting.