Normally, I do standard cost estimate with quantity for
Material type FERT.
Then by configuration on KE4J & KE4R, the breaking up cost
Is transferred to COPA.
However, for only some materials, I donu2019t do standard cost estimate
and insert standard cost to material master directly.
In this case, the standard cost on material master cannot
be transferred. The value become Zero.
Is there any good way?
Or do I have to do standard cost estimate?
Kaneko