Resource and PPM production rate matching question

Hi Guru's

I am creating some capacity reports and for product X at plant Y, the PPM has a production rate of 25k lb/day. However, the resource loading reports in both APO BW and regular BW reflect a production rate of around 15k lb/day. (I am getting this by dividing the Production (Total) by Days Req @ 100%). This is causing the report to show that the resource is scheduled beyond capacity.

All other products on that resource match the PPM rates. The rate for the other equivalent product is 15k lb/day, so the resource loading report may be right, I am just not sure why it doesnu2019t match the PPM. do you guys have any idea?

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jun 01, 2010 at 05:22 PM

    bump for help

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 14, 2010 at 03:23 AM

    closing

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.