on 06-01-2010 12:32 AM
Dear Experts,
Basis team is performing PI 7.1(EHP1 - SP04) readiness check. We are not able to activate Configure RFC Destination. Please refer the following attachment.
We have checked if WF-BATCH user got locked. It is fine and in unlocked status. Is there any setting which are missing? Thanks in Advance.
[http://www.flickr.com/photos/49754947@N07/4657473257/]
Thanks,
Phani Akella.
Closing the thread. Issue got resolved by starting the service using PISUPER user. Initially I was trying to start with my user.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Phani,
Create a RFC connection of type R/3 in the transaction SM59.
http://help.sap.com/saphelp_nw04/helpdata/en/26/64f62cfa8911d386e70000e82011b8/frameset.htm
Or you may go to:
Tcode SM59 -> R/3 connections -> Create
1) Give RFC destination name.
2) Connection type - 3.
3) Technical settings tab -> Target Host -> give the Application Server name -> press enter.
The IP address automatically gets filled up.
4) Logon security tab -> Assign the Logon details.
Also, on the button of the image you posted there is a:
"No Language Can Be Defined for the RFC Destination"
Check for that too.
Regards,
Caio Cagnani
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
25 | |
12 | |
9 | |
6 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.