Former Member
May 27, 2010 at 07:13 AM

BOP is changing MAD on first schedule line i.e unconfirmed scheduled line

297 Views

Hi All.

After I take my BOP run, my MAD on the first schedule changes. It is giving a second schedule line where I get the confirmation.

But I dont want the MAD in first schedule line to change as , this goes in as requirement date when I take SNP run.

EX: Before BOP.

Delivery date D 18.04.2010 Arrival time 00:00

Goods issue date 18.04.2010 GI Time 02:03

Loading date 18.04.2010 Loading Time 02:03

Material avail.date 18.04.2010 Matl Staging Tme 02:03

Transportation Plan. Date 18.04.2010 Tr. Plan. Time 02:03

After BOP. ( BOP run taken on 27.05.2010 )

1st schedule line:-

Delivery date D 18.04.2010 Arrival time 00:00

Goods issue date 27.05.2010 GI Time 02:03

Loading date 27.05.2010 Loading Time 02:03

Material avail.date 27.05.2010 Matl Staging Tme 02:03

Transportation Plan. Date 27.05.2010 Tr. Plan. Time 02:03

2nd schedule line(confirmed)

Delivery date D 09.06.2010 Arrival time 17:30

Goods issue date 09.06.2010 GI Time 17:30

Loading date 09.06.2010 Loading Time 17:30

Material avail.date 09.06.2010 Matl Staging Tme 17:30

Transportation Plan. Date 09.06.2010 Tr. Plan. Time 17:30