cancel
Showing results for 
Search instead for 
Did you mean: 

RMK RCM sync

former_member87241
Discoverer
0 Kudos

Hi All,

We are trying to integrate RMK with another Job Page and we have a query on how the Internal Real time sync and scheduled Sync happens between RCM and RMK.

It would be great if some one can help us with information like- what are the parameters passed between RMK and RCM to identify which jobs are already present and which are already not.

This will help us design integration better because we already know a constraint where if a job posting is deleted in RCM jobs wont be made inactive in RMK automatically and it requires manual intervention. We are just trying to list all such scenarios so that integration with other system will have these factors factored into.

Thanks a lot in advance for the response.

Regards.

Accepted Solutions (0)

Answers (0)