Skip to Content
avatar image
Former Member

SKIP INSPECTION

Dear QM guys

I have received a below requirement from my customer.

We are using DMR for our material to Skip the inspection on frequency based (Inspection type 01). This is working fine.

This DMR or Quality Level is maintained in Material, Vendor and Plant combination.

But my customer requirement was materials will be different, but the Grade is single one and the supplier also single source.

So skip should be work based on Grade not based on material number.

Example : Material No : A, B, C, D, E, F

Grade : SS304

Vendor : 100197

Plant : BD01

Normally Quality level maintained in Combination of Plant - BD01, Material - A, and Vendor - 100197.

My requirement was Quality level and skip should be maintained as Plant - BD01, Grade - SS304, Vendor - 100197.

So that if 25 lots is a frequency, system should take a count of no of lots from all material A to F.

Is there anyway execute this

Regards

M S Madhankumar

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    May 26, 2010 at 07:12 AM

    Its really not possible.

    you may have to find a way where you can create your own dynamic modification criteria like Plant , Grade , Vendor which is not std one.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 26, 2010 at 08:27 AM

    Hi,

    i dont think it is possible in standard.

    What you can do is to have some exit or BADi at the time of creating of inspection lots which can set the status as "SKIP" (if possible) based on your own logic rather than using DMR functionality.

    Thanks

    SUMIT

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 26, 2010 at 08:28 AM

    The question here is how he is arriving on this grading list, if it is a manual activity, you can ask client to consolidate entire materials of the lsit and run a BDC at fixed frequencies.

    I dont think, he will gain anything by creating a Filed in DMR screen called Grade. Grade is nothing but a grouping for him, Once you get the list of Gardewise items, you can run batch jobs to change status of DMR.

    The next question is does he need a report grade wise, then as sujith told, you have to incorporate the grade field in DMR transaction. I feel, you should do this only if a specific requirement for grade wise report.

    Even a DMR with status can be easily extracted with material, vendor and plant combination .

    Thanks

    Vineeth

    Add comment
    10|10000 characters needed characters exceeded