How to Change the BOM Validity To date thru ECM?

Prasath
Contributor
0 Kudos

Dear Experts,

How to change the validity to date of the Bill of material thru Engineering change management .I have tried even. wants to extend the 0010 item to till 31.12.9999

Regards,

Prasath

Accepted Solutions (0)

Answers (2)

Answers (2)

janbuchmann
Contributor
0 Kudos

Hi

You can't. By the looks of it, BOM item 0010 was replaced by another item using AECN160133 effective 08.09.2016. If you need to have the validity extended, create a new change number and use it to change the BOM again.

NB: You might want to review SAP note 60365, which explains the concept of changing BOMs using change numbers.

Regards
Jan

kumar_semmalai
Contributor
0 Kudos

Hello Prasath,


Can you please Try to add new line item with New change number for the existing Line items.

As per std, System will propose the Validity End period as 31.12.9999 by default.

Thanks,

Kumar Semmalai