Hi, there,
I posted ths issue at SCM-PP forum but coudn't get proper answer.
I am working on multi-level material variants with order BOM process. The configurable header material and assembly should be
replaced by material variants after configuration is done. I configured the multi-level BOM explosion at sales order. After I configured the assembly, I executed type matching and a material variant for assembly was found. But the system didn't replace
configurable assembly with material variant automatically and I couldn't find any functionality to carry out replacement. The header material was replaced by material variant in sales order entry. However, while I tried to carried out technical processing to
create order BOM (CU51), the error message shows that I couldn't create order BOM due to the header material has been replaced
with material variant. Does anyone have experience at multi-level material variants with order BOM process? Please kindly help.
Thanks.
B. Regards,
Nancy