Skip to Content
0
Former Member
May 22, 2010 at 06:45 PM

Adding strategy to plan is not possible

49 Views

Hi guys,

I'm trying to add a strategy to the inspection plan, for the sake of stability study on IDES.

I normally used to make it with no problems with best practices, I create the plan, then in trx CWBQM at the header level I add the strategy, then an the operation level in trx CWBQM I start to assign packages of the strategy to the operation.

The problem is that in IDES I'm not able to make the step of assigning packages to the operation, I used to see the icon (LAMP) of maintenance packages, beside inspection characteristics, at the operation level, but in IDES this icon is not present, so I'm not able to assign packages to the operation.

Does any body have any idea how can I solve this issue?

Regards,

MaX