Skip to Content
0
Former Member
May 22, 2010 at 11:07 AM

Check for quality inspection in GR105

148 Views

Dear All,

we are currently having a process where 2 step GRN is done. at the time of GR 103 the inspection lot is getting created. the stock is then checked by quality and a proper UD is made. finally the stock is moved from GR blocked stock to unsrestricted stock using movement type 105.

the requirement is to have a message issued to the user at the time of GR 105 if the quality decision has not been made and there is no UD for the inspection lot. is there a possible way with standard SAP to configure the same. else howto handle the same in development.

thanks in advance

Gurvinder