Automatic PR for ROH materials

Former Member
0 Kudos

Hi Gurus,

I am facing problem in PR creation for ROH material type by MRP. Details are-

ROH material with MRP type VB and re-order point (say 100) is defined. Lot size EX & minimum lot size is defined.Procurement type is F.

This ROH material is part of Material BOM. Production order created for this material.

When I am doing MRP run by MD02 & even MD01, in result it shows OrdRes but no PR.

MD20 is carried out for ROH material (NETCH & NETPL are maintained)

Pls help.

Accepted Solutions (1)

Accepted Solutions (1)

former_member196530
Active Contributor
0 Kudos

Dear ,

1.Goto Material Master MRP4 view -Keep Individual and Collective Indicator as 2 in MM02

2.Run MRP in MD02/MD03 with following set up :

NETCH -Processing Key

Create PR : 1

Delivery SChedule Line : 1

Cretate MRP List : 3

Planning Mode : 3

Schedule : 2

Mark disolay result before SAVE.

Try and reverty back

Regards

JH

Former Member
0 Kudos

Hi Jiaul,

I made the changes as per you but still I am getting same result as shown in above reply.

former_member196530
Active Contributor
0 Kudos

Dear ,

If your required Qty is fulliled by the exsiing fixed reciept , Safety Stock and requirement did not reached the re-order level or beyond ( as you said it is below re-order level) , MRP will not trigger PR

Triggering Automatic PR is based on the Re-order level and MRP Type .

Regards

JH

Edited by: Jiaul Haque on May 20, 2010 10:44 AM

Answers (5)

Answers (5)

former_member1049397
Participant
0 Kudos

Hi ,

I agree with Suhas ,the raw material is planned based on the consumption based planning , so the dependent requirement created by the FG material will not be considered in re-order point planning

Only the re-order point qty falls below the stock then only the requirements get generated

So run the MRP at plant level -MD01 , if the stock falls below ROP then the PR gets generated

Former Member
0 Kudos

Hi all,

Thanks for your efforts. I got the point. I am assigning points accordingly.

Regards,

Kuldeep

Former Member
0 Kudos

Hi,

Change the item category of the raw material to 'N' (non-stock item) in BOM of the finished/SF product. Then run mrp for the finished product. Now system will generate PR for the rawmaterial.

Thanks

Muthu

Former Member
0 Kudos

Hi,

In case of raw material is consumption based, PR will not get generated while taking MRP run of FG. Take MRP run of raw material seperately.

Pl. check & revert

Regards,

Suhas

Former Member
0 Kudos

Hi

Please check wheather u checked REM profile/REM allowed

Regards,

Srihari.M

Former Member
0 Kudos

Hi,

Take MRP run for raw material seperately by using MD02/MD03, as raw material is consumption based PR will not be generated at the time of MRP run of finished goods. Also check the stock.

Regards,

Suhas

Former Member
0 Kudos

Hi Anupam/ Suhas

I did changed EX to FX, and I am able to see PR as you can see below(MD04 screen details).

20.05.2010 Stock 0 0

21.05.2010 OrdRes PP15100 5- 5-

22.05.2010 PurRqs 0010000670/00010 150 145

22.05.2010 OrdRes PP25100 1- 144

22.05.2010 OrdRes PP35100 150- 6-

I generated req. of 5, as fixed lot size is 150 a PR of 150 is created. There was one more Prod order of qty.1. I again created prod order of qty 150 in it but in this case no PR got generated, eventhough it is below reorder point.

Anupam1143
Active Contributor
0 Kudos

Hi

Check if any safety stock is maintained in MM.The First PR is of may be Safety stock.

Regards

Anupam Sharma

Anupam1143
Active Contributor
0 Kudos

HI

Check the stock for the material type ROH. also check with FX lot size instead of EX.

Regards

Anupam Sharma