Goods Issue against Work Order assigned to WBS - Report

Former Member
0 Kudos

We are doing Goods Issue against Work Order with movement 261, the data picked up from work order is not including

the WBS element mentioned on the work order. Through this WBS element report is created through MB51, with total receipts, total issues, transfer postings etc made against WBS element, but without WBS element No. in material document,

we cannot pull this report through MB51, as we see material document No.created against work order but not the WBS

No. there, so this report cannot be pulled from MB51 through WBS element.

Does anyone know of any other report that I can pull From WBS No. as all these material documents are hitting WBS with

total receipts, total issues, transfer postings against the said WBS mentioned in the work order.

Doing Good issue against WBS is no problem, as the material document saves the WBS No.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

1. Try to see CN52N whether meet your business requirments

2. I use two steps approach investigating material documents for project WBS element:

a. use IW39 list the work orders by selection criteria of WBS (this is PM order list).

b. use SAP std. ALV copy functions and past work order numbers into MB51selection criteria

I'm interested in std. t-codes if others can provide. Thanks.

Edited by: Justin zhang on May 19, 2010 10:17 AM

Former Member
0 Kudos

>

> 1. Try to see CN52N whether meet your business requirments

>

> 2. I use two steps approach investigating material documents for project WBS element:

>

> a. use IW39 list the work orders by selection criteria of WBS (this is PM order list).

> b. use SAP std. ALV copy functions and past work order numbers into MB51selection criteria

>

>

> I'm interested in std. t-codes if others can provide. Thanks.

>

> Edited by: Justin zhang on May 19, 2010 10:17 AM

Thanks Justin, your IW39 solution worked, as it has posting date selection defined there

which I cant find in CN52N. My solution was take details from MB51, then pull report IW39 within

posting dates and then export the WBS elements against work order to excel and then copy

the WBS elements in the MB51 report created.

Answers (1)

Answers (1)

former_member203098
Active Contributor
0 Kudos

Hi,

Check CN52N report having GR,GI quantity and MVT

Regards,