I have an alternative BOM for material A produced from material B and C. To producte 10 units of Material A, it takes 1 unit of material B and 10 units of material C; to producted 20 units of material A, it takes 2 units of material B and 20 units of material C. How can I setup the BOM to do this?
***Note- I have another alt BOM setup for material A. To produce 1 unit of A, it takes 1 unit of C and 1 unit of D. Basically, material A is getting created from different package sizes (materail B is 10 gallon container whereas material D is 1 gallon container).
Thanks.