Hi.

In the project I'm working on has the following requirement:

They have a joint production of 4 co-products using a number of raw materials.

The cost of a certain raw material only have to go to one of the co-products, the full 100%.

The problem is that the cost element used for all raw materials consuption is the same , and in the transaction OKEU, where the source structure is defined , only allows me to enter the field label cost element.

I need to define 2 different source in the same source structure:

1- Cost of this certain raw material only go to one co-products

2- The rest of raw material go to all co-products.

But i need an additional field to cost element to can distinguish the cost in this 2 source for then in the material master record, in costing 1 view, joint production , enter the correspondence oco-products assigment, co.products and equivalence number.

Is possible add other label field like origing group in the source definition?

Thanks. Best regards.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

In OKEU,

Create assignments for material or for the group of materials based on how they are apportioned to co-products.

Assign the source cost elements for each assignment you have created.

In MM02, MRP2 - Joint Production - under equivalent numbers you can define how each assignment(material/group of materials) is apportioned to each particular co-product.