Hello Everyone,

I had an issue regarding availability check for production orders.

Consider two production order for header material A and one for B. Both A and B use the same raw material C. Production order 1 for A needs 30 pieces of Material c. Production order 2 needs 200 pieces of material C.

But we have in stock just 100 of C. In the current situation, When I run material availability system Shows that there is sufficient stock for Production order1, but for production order 2 material shortage is just 100. But actual shortage is in fact 130. What is happening is that system sees the stock of 100 and assumes that this stock is available for both the production orders. The first order reservation is not considered. This should not be the case. System should in fact consider the unreserved quantity and then calculate the material shortage. Is there any way I can do this?

Any help is highly appreciated.

Sincerely,

Aji