Hi
I have a scenario where MB (Monthly Lot size) lot size is used with rounding value. Example as below:
Lot size: MB
Min Lot size: 15000
Rounding Value: 20000
DEMAND: 16000
When MRP run, System is creating the 16000 as P Req instead of 20000 which is the rounding value.
Pl let me know, if I need to apply OSS note / any other solution for this.
Thanks,
JK