Dear Gurus
Our client has different Plants in various locations. when we Postgoods Issue in Outbound delivery the system doesn't allow if the material with same batch is being processed at other location. can this be avoided where in same batch of a material in different plants at diff. locations can be processed simultaneously.
regards
Jim