Skip to Content
0
Former Member
May 13, 2010 at 02:54 PM

cancellation for 201 movement type

1562 Views

Hi,

We cosumed material for cost center with 201 movement type on 25.12.2009. Now we must send back to our vendor. But there is no stock in storage location. aA far as I know in this case there are two choıces:

One of them is making cancelletion for material document. But the document date and posting date are not possible periods. Can we do cancellation for current date? Is it wrong for CO? Or what is the effect for CO?

Second of them is making goods receips for 711 movement type.

Which of them are more sutible for CO / this case? or what we can do? Are there another solutions in this case?

Thanks.