Hi gurus,
I have a material X in two plants A and B
B is a only a sales plant. A is both production and sales plant.
At plant B for material X, I create SOP with forecasting based on past periods consumption value.
I got forecast of 500 for material X for the month of June 2010. Transfer this to DM.
I run MRP at plant B. I use sp key 40 for material X with supplying plant as A.
Now I get the requirement of 500 for this material at A.
The material is supplied from A to B through STO. Will this be again booked as consumption at plant A?
I create SOP based on forecast at A plant also. Here I am under the impression that the consumption values of
historical period is only that of sales done from this plant A. Am I right? Or the issues to STO is also booked as consumption?
In that case the forecast goes wrong.
What can I do to avoid the issues to STO being booked as consumption?
Thanks and Regards,
Raghu
Edited by: Raghu Ram on May 13, 2010 3:37 PM