Dear All,
I am facing a problem regarding CRP, i am testing on IDES 6.0 , the problem is that i create a work center having 1 capacity, capacity utilization 100% , no breaks in shift, straight 8 hours working time, when i create work orders with forward scheduling and basic dates not adjusted scheduling type, System is not transfering capacity requirement to other day. like if i create two orders having requirement of 6 and 7 hours, in CM01 system is showing capacity load more then 100% and not shifting it to next day. I got this Paragraph from PM manual but not able to find this check box mentioned, if this is about finite scheduling then its checked in my work center, here is the paragraph.
"The capacity loads already available are considered during capacity scheduling.
Only those work centers that have the indicator Relevant for Capacity Scheduling
are involved in capacity scheduling. For each operation to be scheduled, the
system checks whether sufficient free capacity is available for it on the date
calculated. If sufficient capacity is available, the operation is scheduled. If
sufficient capacity is not available, the operation is shifted to a date when capacity
problems do not arise."
Please help.
Regards,
Rana Adeel