May 13, 2010 at 05:33 AM

Capacity Planning Scheduling Indicator

94 Views

Dear All,

I am facing a problem regarding CRP, i am testing on IDES 6.0 , the problem is that i create a work center having 1 capacity, capacity utilization 100% , no breaks in shift, straight 8 hours working time, when i create work orders with forward scheduling and basic dates not adjusted scheduling type, System is not transfering capacity requirement to other day. like if i create two orders having requirement of 6 and 7 hours, in CM01 system is showing capacity load more then 100% and not shifting it to next day. I got this Paragraph from PM manual but not able to find this check box mentioned, if this is about finite scheduling then its checked in my work center, here is the paragraph.

"The capacity loads already available are considered during capacity scheduling.

Only those work centers that have the indicator Relevant for Capacity Scheduling

are involved in capacity scheduling. For each operation to be scheduled, the

system checks whether sufficient free capacity is available for it on the date

calculated. If sufficient capacity is available, the operation is scheduled. If

sufficient capacity is not available, the operation is shifted to a date when capacity

problems do not arise."

Please help.

Regards,