on 05-12-2010 12:04 PM
I created a sample using QPR1 and created Inspection Lot using QPR5.
Using QA32 for result recording, where I have to select the sample for result recording there is a button to create additional sample but when I press the button, I receive error message "No physical-sample drawing is planned for inspection lot ".
Previously I was able to create additional sample using above procedure.
Kindly help.
for creating samples from there you have to assign the sampling drawing procedure in the task list header.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Previously I was able to create additional sample without any Sample Drawing Procedure this way but right now I am facing this error. Maybe some other consultant has done changes in SPRO but I have to trace that changes.
Please also tell which settings you suggest in Sample Drawing Procedure, if I must have to create a sampling drawing procedure to achieve the objectives.
Edited by: Chris SAP on May 13, 2010 5:01 AM
Edited by: Chris SAP on May 13, 2010 5:02 AM
simplest way is to use fixed sample ( may be 2 nos) in primary sample ( do not use the pooled or reserve)
for more details refer
http://help.sap.com/saphelp_45b/helpdata/en/2d/3520b2448c11d189420000e829fbbd/content.htm