Hello everyone,
I have a question about the PR's quantities checking in SAP. Our production mode is MTO. After running MRP,it produes PR and PL order. For example, one material is GM material. I created a manual PR about 10 M. This material in one finished material required 100 M. I want to run MRP ,the system should produce a PR should be 90 M.
If I want to achieve this goal,how can I do in Background configuration?
Thanks!