Hi,

Just have a simple question : how do we exclude a particular FI docuement type, for example Accruals (Doc Type - AC) from project system availabililty control.

Looking forward to hear from you. Thanks in anticipation.

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member630135
Participant
0 Kudos

I knew this but need exclusion on document type basis..Any user exits ?

On a similar note : I am a little confused on the purpose of Controlling Element in Budgeting ?

If my WBS Level 2 has a budget of 200USD and if I have not distributed 200USD to lower level WBSs, does it mean that 200USD can be used by any of the lower WBS elements ?Does level 2 become a controlling element in such case automatically ? or do we do some config to set the higher levels as controlling elements ?

Thanks.

former_member203108
Active Contributor
0 Kudos

If the WBS element has no budget assigned, but the superior WBS element does have budget, then the superior object is used as controlling object by means of availability control.

former_member630135
Participant
0 Kudos

And we do not have to do any special configuration for this, right ? (if availability control is already activated).

IS there any paricular order for these correction programs or can I run them in any sequence.I believe this should be the sequence if I need to correct availabilty control error messages :

1)RKANBU01 2) RKACOR04 3) CJEN 4)CJBN

Also coming back to my original question : can we not exclude document type from availability control ? No user exits ?

nitin_patoliya
Active Contributor
0 Kudos

Not sure but as per my knowledge there is not exit for this.

With Regards

Nitin P.

virendra_pal
Active Contributor
0 Kudos

check EXIT_SAPLBPFC_002

former_member630135
Participant
0 Kudos

Thanks everyone for all the responses so far..

former_member203108
Active Contributor
0 Kudos

Config is available to exclude cost from availability control by cost element wise but not by document type wise...