Regarding Horizon period in Dynamic Credit Check

Hi All,

i am using a dynamic credit management with horizon as 1 month, suppose consider todays date ( 11th May), as per the configuration, the system should block the documents that has Material availability date till 10th or 11th June, but am getting credit holds even beyond this period, say for the MAD on 30th June too.

am i missing something on the configuration part, also please let me on the ways of changing the horizon period to days from months, currently this field is marked as non-editable & is seen in grey.

Thanks & Regards

Ilango

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    May 11, 2010 at 02:46 PM

    Hi,

    Horizon period considers open sales orders which lie within the horizon period & ignores those open orders which lie outside of it to determine credit remaining.

    Dont think Horizon has any relation with Material Availability date at all.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      i found the answer myself by referring SAP notes, Note 379007 provides clear information that since the update runs on monthly basis, the system uses the entire month.

      Example: as provided in the notes

      Horizon: 2 months

      Current date: August 15th

      End of horizon: August 15th plus 2 months -> October 15th

      Because the update occurs monthly, the

      system uses the complete month into which

      the end of horizon falls.